Lurker News
Specifically in the context of engineering management, how frequently do you have 1-on-1s with your direct reports, how do you structure them, and what have you found to work and not work well?

Comments (153) 56 threads

Earlier comments
jarjar121 reply#
I manage about 110 people at fortune 30. 50-50 mix of FTe and contractors.

However I make it a point to walk around and know almost everyone at some what personal level.
With my leaders I make a point to take them out for lunch once a week on my dime and thats my 1 on 1. For a skip level I take random person out for lunch once a week as well.
For across organizations that I aceess to, I also take their leaders out for lunch once a month or so. Or may just have a short convo as 1 on 1.
Doing one on one in formal setting does not create a personal bond.
Today I have a great relations with many of them.
I try not stop them if they want to give me project status to ensure I understand if there is some personal issue going from or with someone which they want to bring it up. Example is other leaders or architects or others are pushing back on anything.
Experience can probably tell you if they just want to give status update and then I would just stop them gently and say hey good job let’s talk about you.

zild3d#
how many lunches do you eat in a work week? that sounds like a lot more than 5 1-on-1s each week
village-idiot#
Weekly, unless if the report asks for less.

The actual structure of the 1x1 varies on the personality and the state of my relationship with the report. Some engineers are good at talking about how they feel and how things are going, some need some prompting. Sometimes there can be a lot of really uncomfortable silence, which is hard to get used to.
I’ve found that the one real rule is to not let one side or another talk 100% of the time. Plenty of people will use constant chatter as a way to avoid talking about important matters at hand. Sometimes this takes the form of random banter and general ADD things (guilty), but some people will fill the time with a status report to avoid talking about how they’re unhappy with how things are going. If one party tries to run their mouth the entire time, chances are somethings up.
This includes if you, the manager, is the one doing all the talking.

beebs93#
Not a manager, but I meet with my engineering manager once a week.

We set the ground rules early on that we'd avoid the two extremes of the topic spectrum: project status updates and venting about issues that neither of us can take action on to address.
I'm given free reign to choose a topic and drive the meeting. Unless there's some pressing matter, I fallback to reviewing the work I did the past week and how I feel it helps (or doesn't) my career goals.
I try to give good examples of gaps I'd like to address so he can look for such opportunities in future projects, conferences, or in-house training.
My goal is that my manager will have a good understanding of the type of specific tasks I like to do and/or that will better help my future.

bradleyjg1 reply#
From the IC POV:

1) Somewhere between once a month and once a quarter seems about right frequency-wise. Once a week would be way overkill.
2) I want to come out of the meeting with a good sense of how I’m doing. Remember neither being fired nor being promoted (or getting a big bonus etc.) should come as a surprise. If it does, that’s a management failure.
3) This is also a good time to give me context on wider departmental priorities or changes that are in motion which I might not know about.
4) It’s probably a good idea (for your benefit, not mine) to use this opportunity to sound me out for any issues and figure out if I’m unhappy. Preferably in a subtle and comfortable way, but straight out asking probably works okay too.

MisterPea1 reply#
Agree with all the points except for the first. I find biweekly 1:1s to be the perfect frequency.

My manager is very experienced and has great insight, and as an IC this time is very valuable to me. But agree weekly is a little overkill

bradleyjg#
Had me a little confused there for a second. I’m used to semi to mean that, not bi.

I could see every two weeks working in other circumstances than the ones I happened to have found myself in. Maybe even weekly if I worked remotely or something like that.