I didn't run into any Y2K problems - for UNIX/Linux itself this was mostly a non-issue due to times being stored in at least 32-bit time_t at that point. Individual applications may have had their own Y2K related issues of course, but I didn't run into any.
However, one issue I did run into nearly two years later was when UNIX time_t rolled over to 1 billion seconds. The company I worked with at the time was running WU-IMAP for their email server, plus additional patches for qmail-style maildir support. We came into work on September 10th 2001 and all the email on our IMAP server was sorted in the wrong order. Turns out there was a bug in the date sorting function in this particular maildir patch (see http://www.davideous.com/imap-maildir/ - "10-digit unix date rollover problem"). I think we were the first to report it to the maintainer due to the timezone we were in. First time for me in identifying and submitting a patch to fix a critical issue in a piece of open source software! My co-worker and I were chuffed. Of course, we swiftly forgot about it the next day when planes crashed into the NY World Trade Center.
It was like most other big IT problems that are properly anticipated -- a ton of work went into making sure it wasn't a problem, so everyone assumes there was nothing to worry about and all the IT people were lazy and dramatic.
Keep in mind that it was also used as a significant contributing factor to replace a lot of major legacy IT systems (especially accounting systems) at big organisations (a lot of SAP rollouts in the late 90s had Y2K as part of the cost justifications). The company I worked for ran a Y2K Remediation "Factory" for mainframe software - going through and change to 4 digits, checking for leap year issues, confirming various calculations still worked. I worked on a full system replacement that was partially justified on the basis of (roughly) we can spend 0.3x and do y2k patches, or spend X and get a new system using more recent technologies and UIs. There were still problems, but they were generally in less critical systems as likely major systems had been tested, and were remediated or replaced. Keep in mind that there was often much more processing that occurred on desktop computers (traditional fat client) - so lots of effort was also expended on check desktop date rollover behaviour. Once place I worked at had to manually run test software on every computer they had (10's of thousands) because it needed reboots and remote management was more primitive (and less adopted) at the time.
Comments (371) 119 threads
Earlier commentsHowever, one issue I did run into nearly two years later was when UNIX time_t rolled over to 1 billion seconds. The company I worked with at the time was running WU-IMAP for their email server, plus additional patches for qmail-style maildir support. We came into work on September 10th 2001 and all the email on our IMAP server was sorted in the wrong order.
Turns out there was a bug in the date sorting function in this particular maildir patch (see http://www.davideous.com/imap-maildir/ - "10-digit unix date rollover problem"). I think we were the first to report it to the maintainer due to the timezone we were in. First time for me in identifying and submitting a patch to fix a critical issue in a piece of open source software! My co-worker and I were chuffed.
Of course, we swiftly forgot about it the next day when planes crashed into the NY World Trade Center.
But that couldn't be more wrong.
Keep in mind that it was also used as a significant contributing factor to replace a lot of major legacy IT systems (especially accounting systems) at big organisations (a lot of SAP rollouts in the late 90s had Y2K as part of the cost justifications).
The company I worked for ran a Y2K Remediation "Factory" for mainframe software - going through and change to 4 digits, checking for leap year issues, confirming various calculations still worked.
I worked on a full system replacement that was partially justified on the basis of (roughly) we can spend 0.3x and do y2k patches, or spend X and get a new system using more recent technologies and UIs.
There were still problems, but they were generally in less critical systems as likely major systems had been tested, and were remediated or replaced.
Keep in mind that there was often much more processing that occurred on desktop computers (traditional fat client) - so lots of effort was also expended on check desktop date rollover behaviour. Once place I worked at had to manually run test software on every computer they had (10's of thousands) because it needed reboots and remote management was more primitive (and less adopted) at the time.