Lurker News
Hi. I'm the PM for a small fintech startup and the business team is constantly changing priorities based on new client requests, so the tech team cannot cope with all the new features and these end up suffering continuous delays.

Do you let new customers drive your product roadmap, or just decide your own roadmap and stick with it? Which approach works best in order to gain more product velocity?

Comments (123) 61 threads

Earlier comments
bisRepetita#
Vision, passion, and being realistic. All the management techniques won't replace that.

You need vision to gain a credible and influencal seat in front of management and customers, and hear from them. And not just saying yes to the last one who spoke.
You need passion to cope with all the crap (difficulties, management, engineers, customers, nay-sayers, finding ressources, etc).
And you need to be realistic and pragmatic to make something happen, even if not perfect/ideal. Maye next round.

knbknb#
Just yesterday 2020-04-11 Shreyas Doshi (@shreyas) posted a long thread of 30 tweets about "Good" vs "Great" product managers. Some pearls of wisdom are in there:

https://threader.app/thread/1249039638829793280
(He also admits he doesn't knwo any Great PM who has all of the 30 traits and does all those actions, all of the time.)

brightball1 reply#
I was running into a similar issue and after a lot of research ended up adapting the scaled agile framework (SAFe) to our team.

SAFe is designed for larger companies, so you have to learn enough about it to understand where you can trim the fat. The big applications to your issue come from 2 places.
1. Lean Portfolio Management 2. Program Increments
LPM is a process of setting priorities by using real numbers where possible and best guesses otherwise. The result is a process that tries to measure value and urgency against your development capacity. Small things with high value float to the top. Big things with low value drift to the bottom and don’t bog down your team.
The Program Increment (PI) is an intense process that lets your dev team put out a plan for the next 8-12 weeks and gets the business to agree to it. Aside from getting everyone to agree to the current plan, it changes future business requests to “be prioritized for the next increment” which happens via the LPM process.
The PI plan still adapts to new feedback and can change, but those changes come with “if we do this, we can’t do that...is that acceptable?” Time for small changed and some variability is built in, so those conversations only happen for something major.

darkerside1 reply#
The first item (LPM) sounds a lot like our current process, which has worked well for reactive work based on business needs, but all of our long term work feels like it is prioritized ad hoc, based on gut, or worse, doesn't even get done. If be interested in hearing more about PI and how it works.
brightball#
I’ve been meaning to write a blog post about it soon.
csytan#
I'm bootstrapping a simple scheduling SAAS with my wife (https://www.cozycal.com/). As the sole developer, I definitely can relate to the feeling of constantly putting out fires.

We use Canny (https://canny.io/) for feedback tracking. It helps us with:
1. Transparency with our customers. On the support side, we can show that we're tracking their requests, and where they fit into our existing roadmap.
2. Less stressful development cycle. I'm still completing some work in our backlog, but after switching to Canny, it's much more clear what the next features will be.
Also, here's our public Canny board which lists our feature requests & roadmap: https://cozycal.canny.io/

Load more comments