Lurker News
what are the pros and cons of sprints and daily standups in your experience

Coming from old school 'non-agile' financial world focused on bottom line I was in a bit of a shock learning about this daily standup ritual.
Besides being a dream for micromanagers, it seems to be more about signalling progress vs. actually making progress.
Do these extra bureaucracy layers, meetings, checkmarks and vague "man-points" estimates actually bring any value.

Comments (695) 225 threads

Earlier comments
l0b0#

  > Besides being a dream for micromanagers, it seems to be more about signalling progress vs. actually making progress.
There are two massive red flags in that sentence. If the standup is being used as an excuse to micromanage something has gone horribly wrong. And if people don't use it to make progress (that is, asking for help and mentioning blockers) something else has gone terribly wrong.

There are about a million discussions about how broken Agile is, most of which discuss some abomination of a process with very superficial similarities to Agile. It's not like having a standup is some sort of magically good thing on its own if people just use it to do things the way they've always done them.
Cue the inevitable "If everybody is doing Agile wrong, maybe there's something wrong with Agile?" response, to which I would simply say that I've seen Agile work in at least two completely different workplaces, and I've seen how terrible non-Agile processes are in at least another two.

myth2018#
The pros and cons are typically thought of as intrinsic properties of Agile in general. But they are not.

Agile has a number of assumptions regarding organizational culture and the people involved on the project. Those assumptions are usually not discussed very often, which is bad, since I believe they are typically related to those many cases of failed Agile implementations that end up getting different explanations depending on how one likes/dislikes Agile.
To summarize what I'd like to answer about your question:
Pros:
- They are great tools to break larger projects into smaller chunks and to keep track of their progresses. Experience shows that it's easier to reach success on smaller projects, and sprints and daily meetings are ways of emulate such sort of project even when working on larger ones.
- There's an opportunity of catching and fixing schedule slippages, requirements misunderstandings and other sorts of deviations before they get too expensive to fix.
Cons:
- You need a bigger deal of maturity and commitment of people involved. As IT professionals, we usually complain about users being unprepared for working on Agile projects, but we have to admit that many professionals show a significant decrease in performance when they are not under a certain level of healthy pressure.
- When you favor people over processes and communication over documentation, a higher level of mutual trust is required. You can't find that everywhere, for a number of reasons. Some say that such organizations are not prepared to work under Agile rules. Some are more pragmatic and adapt. I stick with the latter. Agile talks a great deal about embracing change on requirements, and I don't see what is the point of being a purist and refusing to adapt the method to deal with risks.

danparsonson#
With respect to all involved, I've so far worked on two projects using scrum, and hated it both times. The biggest problem for me is something I haven't seen too many people mention here - scrum apparently goes hand-in-hand with feature-driven development. Some list of requirements is divided up into small vertical slices through the software, which are drip-fed to the team via the backlog; the end result is akin to building a house in vertical slices. It's possible to work like this but very difficult and without near-prescient levels of foresight on the part of the team leads to large amounts of otherwise unnecessary rework, especially when the requirements inevitably change, which is supposed to be where 'agility' comes into its own. That's not agile, it's clumsy and wasteful.

Far better in my experience to spend time analysing the requirements as a whole, to distil the essence of what's being developed, and design a set of components that express that essential nature in a flexible way, such that the features arise out of the combination of those components rather than being developed in isolation and then mashed together as the project progresses. Accept as a given that intial requirements are just a best guess, and design accordingly - to cram piles of poorly-thought-through code through reams of unit tests is to fight this reality, not to embrace it (note that this is not to rag on unit testing itself, which, like any good tool, is extremely useful when deployed appropriately).
Doing this kind of analysis up front and then developing the components using scrum - that would probably be OK, but I've yet to see or hear of anyone doing that.
As for the process side of scrum: stand-ups are fine if they are kept very short and simply used to express and work through problems, but this appears to require active policing to prevent people rambling, and the retrospectives again are potentially useful, but in my experience turn into long awkward sessions of scratching around to find items for the 'things that went well/went wrong/would change' lists - and more often than not 'things that went well' could be summed up as "we all did our jobs". Celebrate genuinely awesome results, sure, but as a software developer, I don't need or want a pat on the back just for developing software successfully. Overall I would say that the principles of scrum sound nice but when they meet real people the results are somewhere between mediocre and painful.