Ask HN: Are most of us developers lying about how much work we do?
1665 pointsNo one has ever called me out on this and my performance reviews range from mediocre to great. I'm generally a smart person. I went to a top 30 university, but it's not like I'm a genius or I'm coasting off connections made while getting a Harvard education. I wouldn't consider myself an abnormally talented developer. I often don't understand the technical details other engineers discuss in meetings. I have probably bombed more tech interviews than I have passed. All my jobs have been between 2-5 years so I'm neither finding a place to stagnate or leaving before anyone could judge my production. It feels like I am in the middle of the bell curve in terms of career success. So what gives?
Are most of us secretly lying about how much we are working? Do people regularly run into coworkers like me during their career and simply ignore it because they find it too awkward to criticize them? Have I just been incredibly lucky and every boss I have had is too incompetent to notice? Do I have imposter syndrome and I am actually a 10x developer whose laziness makes them a 1x developer?
These questions have kept popping up in my mind over the last year. Remote work during the pandemic has allowed me to finally be honest with myself and stop pretending I am working when I am not. I want to know if I was the only one pretending.
Comments (1,058) 322 threads
Earlier commentsIf I am tasked with design and implementation, I tend to enjoy more so I tend to work more. If I am tasked with just the implementation, I tend to work less.
It also depends on teams. I worked in teams where the product owner wasn't very pushy and the all team mates tried to work as little as possible and I worked in teams where high pressure was the norm, the product owner was very pushing, team mates committed to over work and kind of pressured their pears to overwork, too.
In the low pressure teams we had less code of higher quality, in the high pressure teams we had tons of code of less quality which kind of needed rewrites.
If someone asks me, I don't think either of the extremes is good. A team or developer should produce a reasonable amount of work of good quality.
The basic strategy I've used is to write notes on every status update they give in the daily standups. The updates go right into our sprint planning tool. Then every day they are confronted with the fact that their prediction to, "Get it done today" failed to come true like six days in a row. They either realize the jig is up and get better or I fail to renew their contract if they're a contractor or manage them out/fire them if they're a full time employee.
I had one employee though that would do nothing for about 6 days in a row and then get two weeks of work done in a few days. I could work with that. And she only made like $75k per year (this was about 15 years ago) so it's not like she was getting rockstar salary.
All comments shown.
Couldn't load more comments. Check your connection and try again.