Acela isn't HSR, and Metroliner which came before had travel times from NYC to DC as low as 2.5 hours. Acela does the same trip in 3.5 hours. Metroliner lowered trip times primarily through faster acceleration.
Acela tops out at 150-160 mph (240 km/h-260 km/h) which is is above the 200 km/h bar for it to be considered HSR. Unfortunately, the route it runs on has several speed limits below even 100 km/h due to bridges and tunnels beyond the design life, so it's hard to call it HSR when it can't actually hit those advertised speeds.
Peak speed is how HSRs are defined, and Brightline is 200km/h, which is really mediocre for technology past the 80s, this is the speed at high most upgraded lines run in France.
I just rode it last week, and it actually took 3 hours, not 3.5. Most of the NEC corridor from DC to NYC has a speed limit of 125mph; from NYC to New Haven, it's generally 70mph (!), from New Haven thence to about Kingston generally 90mph, and from there to Boston it's mostly 150mph. Given the density of the corridor, Amtrak should be trying for 150-220mph speed limits, but even 125mph is generally agreed upon to be the lowest end of HSR. A surprisingly easy way to make the train go faster would be to redesign the switching sections before large stations to allow trains to go faster through them. You can probably cut around 10 minutes out of the entire length with an investment of less than $100 million just by doing that.
I read that post, and I have been working slowly on a set of jupyter notebooks, with ipyleaflet (mapping) integration to make building train maps (with max speeds) easier. Looking for colaborators
Could cut it probably but this isn't a private company we are talking about here. The regulations and grifting would be massive, especially in New York which is quite like California with their wastefulness: half to the garbage can, half to their pockets, maybe a cent or two for the actual rails.
So maybe it'd be a few billion at least. Not to say they shouldn't try. But I expect it'll be over budget and behind schedule, it would never happen like Brightline where they broke ground ASAP and just kept building until it was done.
I don't share your pessimism, and that's mostly because I've followed a lot more of the research into why US infrastructure costs are unreasonably high. To put it simply, excessive costs tends to come from a combination of overdesign (in particular the need to add lots of goodies to buy off stakeholders who can otherwise arrest the project), extra overhead in design costs, extra overhead in the way contracts are let, and incompetent management of contractors. But this is the sort of project that doesn't have the design stages to let that scope creep come in--it is pretty much "order off-the-shelf part number 42341 instead of 23421, then do routine maintenance tasks to replace old parts with new ones".
> “Given the density of the corridor, Amtrak should be trying for 150-220mph speed limits, but even 125mph is generally agreed upon to be the lowest end of HSR.”
In the UK and Europe, 125mph (~200 km/h) is considered the top speed limit of conventional rail. Legally, operating speeds beyond that require full in-cab signalling, positive train control, upgraded safety and structural requirements, and whatever else is required for HSR. Further, all the trains operating on a section of line need to be upgraded to those standards if any of them are to run at speeds > 125mph. The UK does have some sections of conventional line that are capable of > 125 mph running, and even have done so in the past, but this is no longer allowed. I’m not sure if the US has similar rules, but it wouldn’t surprise me if so! > ”A surprisingly easy way to make the train go faster would be to redesign the switching sections…” Yes, generally speaking, fixing the low-speed bottlenecks will typically yield the biggest benefits for the cost in terms of overall journey time.
Continue this thread — 2 replies
I just rode it last week, and it actually took 3 hours, not 3.5.
Most of the NEC corridor from DC to NYC has a speed limit of 125mph; from NYC to New Haven, it's generally 70mph (!), from New Haven thence to about Kingston generally 90mph, and from there to Boston it's mostly 150mph. Given the density of the corridor, Amtrak should be trying for 150-220mph speed limits, but even 125mph is generally agreed upon to be the lowest end of HSR.
A surprisingly easy way to make the train go faster would be to redesign the switching sections before large stations to allow trains to go faster through them. You can probably cut around 10 minutes out of the entire length with an investment of less than $100 million just by doing that.
https://github.com/paddymul/train-calculator
So maybe it'd be a few billion at least. Not to say they shouldn't try. But I expect it'll be over budget and behind schedule, it would never happen like Brightline where they broke ground ASAP and just kept building until it was done.
In the UK and Europe, 125mph (~200 km/h) is considered the top speed limit of conventional rail. Legally, operating speeds beyond that require full in-cab signalling, positive train control, upgraded safety and structural requirements, and whatever else is required for HSR. Further, all the trains operating on a section of line need to be upgraded to those standards if any of them are to run at speeds > 125mph.
The UK does have some sections of conventional line that are capable of > 125 mph running, and even have done so in the past, but this is no longer allowed.
I’m not sure if the US has similar rules, but it wouldn’t surprise me if so!
> ”A surprisingly easy way to make the train go faster would be to redesign the switching sections…”
Yes, generally speaking, fixing the low-speed bottlenecks will typically yield the biggest benefits for the cost in terms of overall journey time.
UK is part of Europe. It's like writing "In California and the USA", or "In Mexico and North America".
Continue this thread — 5 replies