Ask HN: What is the most useless project you have worked on?
760 pointsLet me give you some context. I work in the pipeline automation department of a company. Last month, our team decided to deprecate an internal tool due to several maintenance issues. So we created a pipeline that automates the implementation of this legacy tool, in case other teams needed to use it. (WHAT???)
This month, a guy in my team found some improvement scenarios in the automation. So I was chosen to implement this changes in this legacy internal tool.
The thing is, after I finished the adjustments, my pull requests are not getting approved due to adjustments meticulously requested by this guy in my team. Adjustments to make the pipeline automation even more resilient in complete unlikely scenarios.
But this same week, my TL sent notices to all the other teams informing them that this internal tool has been deprecated and they should no longer use it. So what sense does it make to have a pipeline automation that implements the use of the deprecated tool? And if it has been deprecated, why would I need to make an adjustment for the automation to be even resilient if no one should be able to use it anymore? So why am I being allocated to work on in such waste of time like it? (WTF???)
This makes me wonder, how many people have to work on something that they see no sense in doing at all.
So once again, if you're feeling useless, remember that I exist.
Comments (767) 248 threads
Earlier commentsOur company owner didn't like their complaints, so I was told to design one that was "better than theirs." That's it. That was the entire spec. OK, I was also told that customer X would like a board that they can program in C (current board had a built-in BASIC interpreter).
I pointed out that I didn't think it would be helpful, since every customer was happy with what we had, and no one was coming close to its limits. It was a small company: I took most of the customer tech support calls, so I was plugged into what they were doing.
I was told to go do it anyway, "we're not going to be held hostage by those guys."
So, I did. I picked a cool new 16-bit Hitachi (now Renesas) chip that had a nice C cross-compiler available and set off on my pet project. My design had more RAM and more storage and a much faster clock. I wrote a simple text-based serial monitor for debugging and uploading code. It was really nice.
As I predicted, however, it didn't sell a single unit. No one cared about all the stuff I added since the existing board already had far more capability than anyone needed anyway and this one, along with the necessary compiler, cost more than 5x the old one.
They showed it to customer X, who said "it's cool, but why would you think we need this?"
To be fair, that's how most ideas start off. Your boss gave to free reign over a new project. You should have been happier than you seemed.
I just wish that I was able to get all the stuff out of there that they promised me before the Sheriff locked the doors!
A scenario like that typically goes like this:
- Client orders an analysis of something. They want all corners covered, and because they'll use it as evidence/argument/pitch or whatever, you're likely working on a tight deadline.
- You (and others) work tirelessly through the nights, pour hundreds of hours into the analysis, do get it finished before deadline. Everything needs to be perfect and bullet-proof.
- Client is presented with the delivery, skims through it, and thanks you for the work.
- The client changes their mind / abandons it all-together.
Those projects rarely feel rewarding, as you're mostly just fighting the clock, and doing lots of boring routine work. And when it turns out that you and your team are the only ones that will ever read the analysis, that kind of just makes it feel useless.
It was a nice change of pace, paid well, and was able to reuse snippets of material here and there over the years, so not totally useless but never got used for its intended purpose.
Of course, I've also been on projects that were just canceled.
this helps to eliminate greatly this scenario.
Sometimes management decides it’s worth it to spend staff time on something even though there’s a non-zero probability it will never be used. If there’s no fire during the firefighter’s shift, we don’t conclude her time was wasted and that we should never have had the firefighter.
Also, did this EU directive come as a surprise? AFAIK they move at glacial pace and carriers should've seen it coming...
All comments shown.
Couldn't load more comments. Check your connection and try again.