760 pointsLet me give you some context. I work in the pipeline automation department of a company. Last month, our team decided to deprecate an internal tool due to several maintenance issues. So we created a pipeline that automates the implementation of this legacy tool, in case other teams needed to use it. (WHAT???)
This month, a guy in my team found some improvement scenarios in the automation. So I was chosen to implement this changes in this legacy internal tool.
The thing is, after I finished the adjustments, my pull requests are not getting approved due to adjustments meticulously requested by this guy in my team. Adjustments to make the pipeline automation even more resilient in complete unlikely scenarios.
But this same week, my TL sent notices to all the other teams informing them that this internal tool has been deprecated and they should no longer use it. So what sense does it make to have a pipeline automation that implements the use of the deprecated tool? And if it has been deprecated, why would I need to make an adjustment for the automation to be even resilient if no one should be able to use it anymore? So why am I being allocated to work on in such waste of time like it? (WTF???)
This makes me wonder, how many people have to work on something that they see no sense in doing at all.
So once again, if you're feeling useless, remember that I exist.
Comments (767) 248 threads
Earlier commentsWe implemented the contract faithfully, and checked all the boxes, but nobody outside the government wanted to use the system.
We had a namespace of sorts we would allocate to the users in the community. There were a few times we wanted to make backward incompatible changes, which we were hesitant to do for good reason, but then I would go and check which parts of the namespace we had allocated and see that literally nobody had used the system yet, so we went ahead and made the backwards incompatible changes.
I left part way though the project. I don't know if they ever got any real users, but they did get the government's money, and, in fairness, did an honest job following the contract, so I can't blame the company.
It was one of my first jobs and it bothered me a lot how weird things were following a contract rather than doing what actual users wanted. At the time I imagined how great things would be having real users I could deliver value to, but have since learned users aren't always as wonderful as I imagined.
They were in the process of moving from paper to digital forms. This meant for each field in a form updating about eight different data objects across three data abstractions. Imagine a form with thirty fields.
Now this is tedious and prone to error, but it gets worse
The form I was working on was not well thought out, but we had to build it anyway. So on the first demo to the functional designers, or 'stakeholders', we pointed out several oversights, which we were asked to correct. And ofcourse process some other changes they found themselves. This is half the fields in the form, so we already did a lot of useless work. But it gets worse.
The form in question was about the city being able to judge if somebody would be entitled to benefits. Citizens with benefits would be asked to volunarily fill in this form, and judged if they could keep their benefits. Yes, voluntarily. Would you fill in a form, which could make you lose monthly income? Or not fill it in, and keep your benefits?
Pointing this out had no effect. For me, the form was useless, and so was the technical implementation.
I left that month.
Memory is hazy, and I may get some of this wrong because I left the industry a while back.
One was a multi-port T1/E1 interface card that provided -48V line power to downstream repeaters or CPE. Think PoE but over T1/E1 interfaces at telco voltages and ruggedized to sit in an outdoor metal cabinet with no fans. All components were rated -40C to +85C. I am glad it was cancelled. It was going to be a safety and regulatory certification nightmare.
Another was a multi-port DS3 interface card that did circuit emulation over Ethernet. There were no off-the-shelf ICs that could do everything they wanted. So, we ended up with 4 very expensive FPGAs on the board. This one went into second prototype stage before being cancelled. I'd guess, $200k spent just on prototype hardware.
I can't remember the third project. At that stage I was jokingly known as some sort of project killer.