Ask HN: Why don't companies hire programmers for fewer hours per day?
498 pointsMaybe this question doesn't properly apply to USA programmers since labor laws are a little different there, but let me try.
Rationale: we always discuss how programming makes us tired and stressed, how often we spend hours and hours per day just procrastinating or being completely unproductive while still trying to be. Also, we often discuss how programmers get paid nice salaries in comparison with most other professions. This leads me to the conclusion: I'd probably be very happy to take a 25% (or more) salary cut if I had to work 25% (or more) less. I mean, 8 hours per day is a lot and it's very rare for me to have a fully productive day. If I moved to 6 hours per day, I'm not even sure if I'd become less productive, I'd probably just spend less time chatting at the coffee room, and have a smaller chance to get burnout. Maybe a little less productive, but the company would be saving some money with me, and if they did this to other 3 people they would be able to hire another 6h/day programmer to balance things, maybe making the result even positive for them.
But, considering that no company does this, it looks like this isn't a good idea for employers. Why? Why do companies try to squeeze all the possible juice from employees instead of the alternative where they pay a little less, require a little less, and the employee becomes much more happy?
And the question to the workers: wouldn't you accept a proportional salary reduction for a proportional time-spent-inside-the-office-doing-whatever reduction?
Comments (348) 80 threads
Here I will quote a HN post which quotes a secondary source which analyses mythical man month
"From a business point of view, long hours by programmers are a key to profitability. Suppose that a programmer needs to spend 25 hours per week keeping current with new technology, getting coordinated with other programmers, contributing to documentation and thought leadership pieces, and comprehending the structures of the systems being extended. Under this assumption, a programmer who works 55 hours per week will produce twice as much code as one who works 40 hours per week. In The Mythical Man-Month, the only great book ever written on software engineering, Fred Brooks concludes that no software product should be designed by more than two people. He argues that a program designed by more than two people might be more complete but it will never be easy to understand because it will not be as consistent as something designed by fewer people. This means that if you want to follow the best practices of the industry in terms of design and architecture, the only way to improve speed to market is to have the same people working longer hours. Finally there is the common sense notion that the smaller the team the less management overhead. A product is going to get out the door much faster if it is built by 4 people working 70-hour weeks (180 productive programmer-hours per week, after subtracting for 25 hours of coordination and structure comprehension time) than if by 12 people working 40-hour weeks (the same net of 180 hours per week). The 12-person team will inevitably require additional managers and all-day meetings to stay coordinated."
https://news.ycombinator.com/item?id=3547965
Continue this thread — 13 replies
Which team would you bet on? The team of great devs at 32hrs a week, or the team of decent devs at 40 hrs a week? You hear about the 10x developer, but if a 1 in 10 developer is even just 1.3x they end up being a better deal at 32hrs a week than avg devs at 40 hrs a week.
[0] Think of an average developer as the avg developer you work with, and the great developer as the best developer you work with.
I think that usually in these discussions, the money saved (the 20%) is intended to be used on other things than development.
Continue this thread — 14 replies
A programmer who works 55 hours a week will produce twice as much code - but for how long? Once fatigue settles in (a few weeks in), you're back at the 40-hour productivity levels, just paying it at 55-hour rates (and organizational overhead for overtime, oooh boy!), plus burning out the developers (and organizational overhead for employee churn).
Your assumption is that 55 hour weeks are sustainable: just change this number in the spreadsheet from 40 to 55, and voila! And while we're at it, why not 80? Why not 200? Very PHB-ish, in my unhumble opinion.
By my experience I would say around 18-24 months.
Continue this thread — 3 replies
Continue this thread — 11 replies
I've tried the steady working, but I just do not operate that way. When there is work to do I do it, and simply have a hard time sitting still or concentrating on something else.
I'm fortunate to be in a field and with a company that is flexible in this way. I also really like this method. When I'm on vacation that is my 100% focus. I'd much rather work a lot and then completely unplugged instead of always working even on vacation.
This is most true for tasks that are more intellectually demanding, like the development of large-scale software (which is what Brooks was writing about.) The more routine a task is, the easier it is to divide it up (though that is rarely to the benefit of the worker.)
200 hour weeks would be quite unsustainable, indeed. Forget not sleeping, where do you get the other 32 hours?
Rather you're back at far worse than 40-hour levels. Once fatigue settles in the code will be much worse.
I agree however that adding more developers can slow things down but this is partly a result of how software is designed and work divided up.
Continue this thread — 3 more replies
Continue this thread — 3 more replies
Lets say you get to work, sit down, and you veg out for 30 minutes to kindof ease into the zone. Then you get going on your project, and it takes another hour or so to get fully up to speed, track down a failing test that someone committed, whatever. Then in the afternoon, you chat with a co-worker for half an hour after lunch.
Now you have 6 hours of productivity in an 8 hour day, but 4 hours in a 6 hour day. The main point being that there may be some 'fixed cost' things that don't scale up or down so much.
Continue this thread — 2 replies
Continue this thread — 5 replies
Doing an 8-hour day means that you get 5 hours of decent work, which is not viable for the output that we need.
With 12-hour shifts, we work 3-4 days a week and get more done than people who work 8 hours a day, 5 days a week. And we get overtime!
Increased employee costs make an employer less likely to take risks and produce pressure to hire less workers. Then a few workers gain at the expense of others not having a job at all. Why do you hate workers?
Continue this thread — 1 reply
In Australia "taxes and mandatory benefits" on a $100k USD salary cost the employee ~30% in taxes and medicare levy and the employer ~5% payroll tax + ~10% superannuation (401k). In total, 1.15x the salary is being spent and of that, 0.69x goes to the employee.
If the employer pays an extra 50% salary in the US, then 1.5x the salary is being spent but the employee only gets salary after tax, which (based on my payslip) is only ~0.65x salary. So the employee only gets 0.43x the total amount being spent. If the employer has a fairly generous 401k match that results in an extra ~10% going to the employee from that extra 50%, that's still only 0.50x the expense going to the employee.
As someone who's lived in both countries, I don't really get anything extra in the US thanks to that cut. The health insurance seems to be the main thing people care about but I found healthcare in Australia to be cheaper and superior to the care I've had in the US (on PPO).
I think the US needs to adopt single payer healthcare like the civilised world and work out its government spending and taxes a little better.
Continue this thread — 1 reply
Continue this thread — 11 more replies
When I originally reduced from 100 to 80%, during my next annual review, my boss was surprised that it didn't impact my apparent productivity in the slightest, which supports your theory: More hours have diminishing returns, but cost the same from the employer's POV, so it would be better to spread it out to multiple people.
Indeed, the part-time model has been gaining traction within my circle of colleagues (in Germany). Many of them are taking a day per week off to work on their private projects, or cutting away some hours to spend more time with their children.
Continue this thread — 6 replies
When applying for my current job I made my salary proposition. My future boss to be told me that he had an more or less fixed absolute upper limit he tries to keep employees payroll below - so I told him that if the amout of money he is willing to pay is limited we can simply adjust the hours, and decided to do only 6hrs a day. I work from my 'home office', in the back yard under a roof beyond the sun, dont have to waste time every day to travel to some cramped up office, get food delivered by my wife, and have the rest of the day to spend with our son.
And since there is quite some time left I still have time to run my startup on 'spare time'
[Austria]
Dont give up - there are employers that honestly care about emloyees wellbeing.
I hop in the car and drive to the office (3hr drive) every month or so, stay for 2 days, do some meetings and go home then. I guess it's important to have a beer with your git-mates now and then.
Continue this thread — 7 replies
All comments shown.
Couldn't load more comments. Check your connection and try again.