Specifically in the context of engineering management, how frequently do you have 1-on-1s with your direct reports, how do you structure them, and what have you found to work and not work well?

Comments (153) 56 threads

Show all comments

Showing thread 16 of 56

eismcc1 reply#
I once had a manager that would walk through the office and call people in for 1:1s in such a way that I felt like I was at a doctor’s office. The meeting itself was almost the same - you’d say your bit and then he’d have a list of things he wanted to cover. I called him out on this and though initially a bit shocked, did improve a bit. As s manager, even though you are coming from a position of “authority,” don’t treat your people like cattle.
audiolion#
My manager does 1-1s back to back in 30 min blocks and as each engineer comes back they call the next person to go up. I don't get the cattle feeling but is it unusual or bad practice to do them back to back?

Also what would you think if the manager was late for the set block of 1-1s by 40 mins?