> I've only had a DC fail once when the engineer was performing work on the power circuitry for the DC and thought he was taking down one, but was in fact the wrong one and took both power circuits down at the same time.
This is all local scale. Your setup would not survive a data center scale power outage. At scale power outages are datacenter scale. Data centers lose supply lines. They lose transformers. Sometimes they lose primary feed and secondary feed at the same time. Automatic transfer switches cannot be tested periodically i.e. they are typically tested once. Testing them is not "fire up a generator and see if we can draw from it" It is cheaper to design a system that must be up which accounts for a data center being totally down and a portion of the system being totally unavailable than to add more datacenter mitigations.
Yes but if you have reliable power from two different sources then the biggest risk (I'd imagine) is the failover circuitry! Something that should be tested tbh.
Also, there are banks of batteries and generators in between the power company cables and the kit: did they not kick-in? Again, this is all pure speculation: I have absolutely no idea of the exact failure, nor how their infrastructure is held together - this is all just speculation for the hell of it :)
I've had bad power supplies fry out taking the whole power circuit with it, and thus half (or whatever fraction) of the rack's power.
I've also had bad power supplies bring down the whole machine as they shunted everything internal too. When things go bad, anything can happen. You can provide the best effort, and it'll usually work as expected, but there will always be something that can overcome your best efforts.
> Yes but if you have reliable power from two different sources then the biggest risk (I'd imagine) is the failover circuitry! Something that should be tested tbh.
That's ATS. It is not really advisable to test their under load performance because the failure of an ATS would be catastrophic. ATS typically would be tested at the installation and after that their parameters would be monitored. Replacing a functional in line ATS would be a 9-12 months long project. > Also, there are banks of batteries and generators in between the power company cables and the kit: did they not kick-in? At high energy you are pretty much always going to use an ATS.
The datacenter we were in had dual-sourced grid power (two separate grid connections on opposite sides of the block, coming from different substations) along with a room of batteries (good for iirc 1hr total runtime for the whole datacenter, setup in quad banks, two on each "rail"), _and_ multiple independent massive diesel generators, which they ran and switched power to every month for at least an hour.
And to top it off each rack had its own smaller UPS at the bottom and top, fed off both rails, and each server was fed from both. We never had a power issue there; in fact SDGE would ask them to throw to the generators during potential brown-out conditions. Of course this was a datacenter that was a former General Atomics setup iirc ...
We were in a triple sourced data center. Fed by three different substations. Everything worked like a charm. Until Sandy hit. It did not affect us at all. But it affected the power company. And everything still worked fine, until one of the transfer switches transferred into UPS position and stopped working in that position.
"It is cheaper to design a system that must be up which accounts for a data center being totally down and a portion of the system being totally unavailable than to add more datacenter mitigations."
Citation needed - the same issue with testing, data races and expensive bandwidth come up.
The only full datacenter outage I've personally experienced was a power maintenance tech testing the transfer switch between systems where the power was 90 degrees out of phase. Big oof.
Transfer switches at any facility that's worth being colocated in are exercised as periodically as the generators to which they connect. In all of the facilities I have had systems in (>20MW total steady state IT load), that meant once per month at minimum to keep generators happy -and to ensure the transfer functionality works-, and more often if the local grid demands it, e.g. ComEd in Chicago, or Dominion in NoVA asking for load shedding.
This is all local scale. Your setup would not survive a data center scale power outage. At scale power outages are datacenter scale.
Data centers lose supply lines. They lose transformers. Sometimes they lose primary feed and secondary feed at the same time. Automatic transfer switches cannot be tested periodically i.e. they are typically tested once. Testing them is not "fire up a generator and see if we can draw from it"
It is cheaper to design a system that must be up which accounts for a data center being totally down and a portion of the system being totally unavailable than to add more datacenter mitigations.
Also, there are banks of batteries and generators in between the power company cables and the kit: did they not kick-in?
Again, this is all pure speculation: I have absolutely no idea of the exact failure, nor how their infrastructure is held together - this is all just speculation for the hell of it :)
I've had bad power supplies fry out taking the whole power circuit with it, and thus half (or whatever fraction) of the rack's power. I've also had bad power supplies bring down the whole machine as they shunted everything internal too.
When things go bad, anything can happen. You can provide the best effort, and it'll usually work as expected, but there will always be something that can overcome your best efforts.
That's ATS. It is not really advisable to test their under load performance because the failure of an ATS would be catastrophic. ATS typically would be tested at the installation and after that their parameters would be monitored.
Replacing a functional in line ATS would be a 9-12 months long project.
> Also, there are banks of batteries and generators in between the power company cables and the kit: did they not kick-in?
At high energy you are pretty much always going to use an ATS.
Because that would mean no power at all to the DC and no way to get it back? (I am completely ignorant on this topic)
Continue this thread — 1 reply
And to top it off each rack had its own smaller UPS at the bottom and top, fed off both rails, and each server was fed from both.
We never had a power issue there; in fact SDGE would ask them to throw to the generators during potential brown-out conditions.
Of course this was a datacenter that was a former General Atomics setup iirc ...
Citation needed - the same issue with testing, data races and expensive bandwidth come up.