Ask HN: What is the most useless project you have worked on?
760 pointsLet me give you some context. I work in the pipeline automation department of a company. Last month, our team decided to deprecate an internal tool due to several maintenance issues. So we created a pipeline that automates the implementation of this legacy tool, in case other teams needed to use it. (WHAT???)
This month, a guy in my team found some improvement scenarios in the automation. So I was chosen to implement this changes in this legacy internal tool.
The thing is, after I finished the adjustments, my pull requests are not getting approved due to adjustments meticulously requested by this guy in my team. Adjustments to make the pipeline automation even more resilient in complete unlikely scenarios.
But this same week, my TL sent notices to all the other teams informing them that this internal tool has been deprecated and they should no longer use it. So what sense does it make to have a pipeline automation that implements the use of the deprecated tool? And if it has been deprecated, why would I need to make an adjustment for the automation to be even resilient if no one should be able to use it anymore? So why am I being allocated to work on in such waste of time like it? (WTF???)
This makes me wonder, how many people have to work on something that they see no sense in doing at all.
So once again, if you're feeling useless, remember that I exist.
Comments (767) 248 threads
Show all comments
Showing thread 3 of 248
Anyway, the only task they ever gave me was to build Cisco router ACLs to match existing traffic in the stores; they needed to implement access control but wanted to make sure they weren't blocking anything important. Because many of the stores had been opened years before, there wasn't necessarily a consistent IT stack in the store; there were a lot of one-off solutions so they wanted a universal set of rules with per-store exception lists.
So, every week, someone would drop a few terabytes of network logs in an FTP server, separated by store, and I would distill them down to a set of rules; if something was being used in more than X number of stores, it went in the universal rule list, if it wasn't it went in a store exception list. At first I was doing it semi-manually, but eventually I built a database and wrote some SQL to mostly automate it - got it down to about two hours a week, most of it waiting for the DB, by the end. Once it was done, I would send all of my updates to a network engineer who was the designated point of contact for the access control project.
They had a lot of stores, and for some reason could only supply a certain amount of logs weekly, so when my contract was up there were still a number remaining. I tried to set up a meeting with the network engineer to go over the work to be done and the automation I'd built, but he never responded. Eventually I tracked down his desk in the vast corporate complex and paid him a visit. He was pleasant but told me that he wasn't even on the access control project and he thought it had probably been canceled at some point. He had been dutifully copying my updates to a network share somewhere in case they were ever needed. I gave him the SQL scripts and the database info and he put them out on the share where they probably still are today, a decade and a half later.
So that was six months of my working life.
What a line.
https://wm-help.net/lib/b/book/2895812152/59
I love it. A co-worker of mine told a similar story. For at least six months, his only regular responsibility was to compile a report every week and email it to a distribution list for the headquarters one echelon above us. It wasn't a ton of work, but it was all manual and he was meticulous. He dutifully did this without any feedback until someone finally replied to simply say, "We do not require this report, and have never required it. You may choose to either continue or discontinue sending it."
BP: 'We always like to avoid confrontation, whenever possible. Problem solved from your end.'