Microsoft finds underwater datacenters are reliable, practical and use energy sustainably
https://news.microsoft.com/source/features/sustainability/pr...
Sucks for everyone else though.
24/7 solar power with 9 times the power of surface solar without grud waiting times and regs
With 0 land, water or zoning bottlenecks. Free global real estate.
Continue this thread — 7 replies
> A submerged data center is orders of magnitude easier and cheaper than a space data center.
Source?
Then there's the fact that you can run hardlines to ocean datacenters, the fact that the ocean provides abundant coolant (cooling things in space is hard but this might surpass common knowledge), the fact that repairs and upgrades don't require a rocket, astronaut, and spacewalk, the fact that you only need to harden against salt water instead of radiation and micrometeoroids, etc.
On the other hand, a data center in space? A data center is heavy. Solar panels are heavy. That's not a problem on land and sea. It is a problem when you have to lift it into space. Then what about maintenance Do you send a regular crew into space to work on it? Or do you keep a crew in space like a giant space station? It's all doable but at what cost?
Continue this thread — 3 replies
Your whole premise assumes that energy to run these things is free/cheap and that energy to install them is the dominating factor. 24/7 solar power in space is literally the entire argument for these orbital datacenters. So unless you have some proposal for why electricity is easier to get underwater, you’re just ignoring the most significant factor.
Data centers on land are even easier than data centers in water. But they are getting blocked because of FUD about power prices.
So yes, a source is necessary because you ignored the biggest ongoing cost to running a datacenter when applying “basic common knowledge”.
Continue this thread — 2 replies
Continue this thread — 1 reply
More like IF Starship works. This thing is spearheaded by the same guy who spearheaded the Hyperloop high-speed rail, which became a single-car tunnel under Las Vegas, Humanoid robots that are actually just people in bodysuits, the Cybertruck, which was a complete flop, and now "flying cars" that are just proofs of concept that won't ever actually get sold (or will kill people if they are).