Lurker News
I have had an extremely good experience doing a 4 hour per day, 4 day per week job, in which I was mainly doing a greenfield project for a startup company.

Hands down, it was best work experience I have ever had. I was asked to do little every week, so I always had an extreme desire to outperform expectations, which led to an extreme drive to work, great work / life balance, and a very(!) productive throughput every single workday!
Another curious side-effect was to (on several occasions) actually work beyond the required ~16 hours per week, out of sheer pleasure.
I still remember that the same day I started working full time for that same company, my energy/happiness/productivity levels plunged, to only be lowered along the years.
I sincerely think it is quite unrealistic to ask a knowledge worker consistently deliver at full throttle for 40 hours every week (never mind the enslaving 60+ hours on many companies)
So my questions are the following:
- Are these 4/4 jobs easy to find? In which areas / programming language domains?
- Only greenfield projects make sense for this kind of work schedule?

Comments (261) 77 threads

Show all comments

Showing thread 30 of 77

dlevine1 reply#
At the moment I'm a freelance software developer, and I take on multiple projects at once. Right now, I'm working on three projects, and typically end up spending 4-6 hours a day on billable work. I can put in more, but after a point, I can feel my productivity drop off.

Realistically, I end up completing 20-25 hours of billable work a week (and probably another 10-15 doing stuff that isn't directly billable). I could spend more time working on billable stuff, but I find that there are heavily diminishing returns after that point. Sure I can get in more productivity for a brief period (a few weeks max), but there is always debt to repay.
A lot of people tell me that they are looking for someone who is "half time", which to them means 20 hours a week. I've tried to explain to them that I don't schedule 40 hours of work in a week, and that for me "half-time" is 10-15 (productive) hours. A lot of people won't accept that.
I'm finding that it's easier to tell them that I'll work half-time, get more work done in 10-15 hours than most people would in 20, and then bill them for the time that I actually worked. If I'm getting the project done, then they aren't going to complain that I'm billing them for too few hours. That obviously doesn't work if they are expecting me to be on-site 20 hours a week, but in my case (where I work in my own office), it seems to be ok.

capisce#
A comfortable level of 20-25 hours of billable work per week seems to fit my experience in freelancing too. In the long run I don't think I'd want to try to push much beyond that.