Lurker News
Hello

Maybe this question doesn't properly apply to USA programmers since labor laws are a little different there, but let me try.
Rationale: we always discuss how programming makes us tired and stressed, how often we spend hours and hours per day just procrastinating or being completely unproductive while still trying to be. Also, we often discuss how programmers get paid nice salaries in comparison with most other professions. This leads me to the conclusion: I'd probably be very happy to take a 25% (or more) salary cut if I had to work 25% (or more) less. I mean, 8 hours per day is a lot and it's very rare for me to have a fully productive day. If I moved to 6 hours per day, I'm not even sure if I'd become less productive, I'd probably just spend less time chatting at the coffee room, and have a smaller chance to get burnout. Maybe a little less productive, but the company would be saving some money with me, and if they did this to other 3 people they would be able to hire another 6h/day programmer to balance things, maybe making the result even positive for them.
But, considering that no company does this, it looks like this isn't a good idea for employers. Why? Why do companies try to squeeze all the possible juice from employees instead of the alternative where they pay a little less, require a little less, and the employee becomes much more happy?
And the question to the workers: wouldn't you accept a proportional salary reduction for a proportional time-spent-inside-the-office-doing-whatever reduction?

Comments (348) 80 threads

Show all comments

Showing thread 1 of 80

dustingetz8 replies#
Mythical man month says that even if longer hours have diminishing returns, the organizational overhead from adding people to the team is worse - fewer people with longer hours is the better alternative.

Here I will quote a HN post which quotes a secondary source which analyses mythical man month
"From a business point of view, long hours by programmers are a key to profitability. Suppose that a programmer needs to spend 25 hours per week keeping current with new technology, getting coordinated with other programmers, contributing to documentation and thought leadership pieces, and comprehending the structures of the systems being extended. Under this assumption, a programmer who works 55 hours per week will produce twice as much code as one who works 40 hours per week. In The Mythical Man-Month, the only great book ever written on software engineering, Fred Brooks concludes that no software product should be designed by more than two people. He argues that a program designed by more than two people might be more complete but it will never be easy to understand because it will not be as consistent as something designed by fewer people. This means that if you want to follow the best practices of the industry in terms of design and architecture, the only way to improve speed to market is to have the same people working longer hours. Finally there is the common sense notion that the smaller the team the less management overhead. A product is going to get out the door much faster if it is built by 4 people working 70-hour weeks (180 productive programmer-hours per week, after subtracting for 25 hours of coordination and structure comprehension time) than if by 12 people working 40-hour weeks (the same net of 180 hours per week). The 12-person team will inevitably require additional managers and all-day meetings to stay coordinated."
https://news.ycombinator.com/item?id=3547965

PhasmaFelis1 reply#
That completely ignores the documented productivity drop from working so many hours, though.
timblair3 replies#
I don't agree with working like this, but I'd expect that you're generally going to get marginal gains from each extra hour worked (up to a point of exhaustion or burnout), especially in the short term, so it might make sense to have people work in this way _occasionally_. I know I've been on "work all the hours available" projects in the past, and I definitely got a lot more done than I would have just working a 40hr week, even if I did feel like cr*p at the end of it.
PhasmaFelis13 replies#
Yeah, short-term crunch can sometimes make sense, as long as it's actually short-term and doesn't repeat on a monthly basis.

Continue this thread — 13 replies

lmm#
Interesting. My experience is that when I limited myself strictly to 6 hour days I got a lot more done than I get done in 8-hour days.
aminorex#
I have often seen people putting in extra hours with negative productivity. One small error can result in days of lost time.
JamesBarney1 reply#
But what if instead of using the 20% to reduce cost, you use it to increase quality. For instance if you have 100k / developer budget and instead of buying a group of 5 avg. developers[1] for 40 hrs/week, you buy 5 great devs for 32 hrs/week. Then overhead per developer stays the same.

Which team would you bet on? The team of great devs at 32hrs a week, or the team of decent devs at 40 hrs a week? You hear about the 10x developer, but if a 1 in 10 developer is even just 1.3x they end up being a better deal at 32hrs a week than avg devs at 40 hrs a week.
[0] Think of an average developer as the avg developer you work with, and the great developer as the best developer you work with.

true_religion1 reply#
I would bet on the team who has the best marketing plan and support package because quality at point of sale is rarely the differentiator in a company's success.

I think that usually in these discussions, the money saved (the 20%) is intended to be used on other things than development.

Piskvorrr14 replies#
It's a pipe dream. The "saved" money is eaten by fixing the crappy code written at 4 AM, three months into crunch mode. Only works if you can bully the developers into unpaid overtime.

Continue this thread — 14 replies

Piskvorrr5 replies#
Quoting TMMM as a justification for product death march? Wow.

A programmer who works 55 hours a week will produce twice as much code - but for how long? Once fatigue settles in (a few weeks in), you're back at the 40-hour productivity levels, just paying it at 55-hour rates (and organizational overhead for overtime, oooh boy!), plus burning out the developers (and organizational overhead for employee churn).
Your assumption is that 55 hour weeks are sustainable: just change this number in the spreadsheet from 40 to 55, and voila! And while we're at it, why not 80? Why not 200? Very PHB-ish, in my unhumble opinion.

sintaxi4 replies#
> A programmer who works 55 hours a week will produce twice as much code - but for how long?

By my experience I would say around 18-24 months.

Ma8ee2 replies#
Maybe it's because I'm a little bit over forty, but for me only a few days working 10 hours a day (plus a significant commute) decreases my productivity significantly. That is at least if I have to work on more that one project at a time. If I don't have to switch tasks and it is relatively straightforward work I can probably manage for a few weeks, but not much longer and I know that I'll definitely hate my life.
Mikushi1 reply#
I am thirty and I find the same. More than two weeks of heavy days and my productivity plummets until I get proper time off.
ferentchak#
If the project is fun I can work two times as long without fatigue. For example if I think this is important and my effort personally can make the difference. Or if I am using a new technology or something that feels like a "portfolio" piece.
Spooky23#
That's a benefit to some business types. You're getting grey and expensive.
Piskvorrr11 replies#
At which point they ragequit. But hey, never mind the burnout, let's just find another cog for the machine. Never mind the ramp-up cost - fifty-five hours a week, yeeehaw!

Continue this thread — 11 replies

sharemywin#
A lot depends on how into the project I am.
matwood#
I'm naturally a sprinter type, so I tend to set up my work the same way. I tend to work more in the winter (55+ hours) since there isn't much else to do anyway, and work less during the summer (40 or less). I'll also work like you suggest for multi-month stretches and then take a few weeks off and go on vacation.

I've tried the steady working, but I just do not operate that way. When there is work to do I do it, and simply have a hard time sitting still or concentrating on something else.
I'm fortunate to be in a field and with a company that is flexible in this way. I also really like this method. When I'm on vacation that is my 100% focus. I'd much rather work a lot and then completely unplugged instead of always working even on vacation.

mannykannot#
MMM is actually an important part of the answer, and it is unfortunate that it was presented this way (death marches are deprecated for their own reasons.) The right way to think of this is to consider four people each working two hours a day on the same problem. Sustained effort and focus matter.

This is most true for tasks that are more intellectually demanding, like the development of large-scale software (which is what Brooks was writing about.) The more routine a task is, the easier it is to divide it up (though that is rarely to the benefit of the worker.)

skywhopper3 replies#
One of the points of TMMM is that communication and coordination overhead is a cost and a risk and that it grows exponentially in relation to the number of programmers you have. So, you won't get double the productivity out of twice as many programmers (unless they're on unrelated projects--but more projects == more overhead as well).

200 hour weeks would be quite unsustainable, indeed. Forget not sleeping, where do you get the other 32 hours?

Sniffnoy#
Quadratically, IINM, not exponentially.
Piskvorrr#
I was wondering whether anyone would catch on ;) Anyway, I wasn't arguing that more developers is easier (I do believe it might be better) - I was saying that piling hours on top doesn't scale either.
corobo#
Simply have the developer use two computers at the same time, thereby doubling their man-hours
coldtea#
>Once fatigue settles in (a few weeks in), you're back at the 40-hour productivity levels, just paying it at 55-hour rates

Rather you're back at far worse than 40-hour levels. Once fatigue settles in the code will be much worse.

codingoutloud#
Took me a while to realize that PHB = pointy haired boss.
br3w5#
Maybe it's the quote lacking context but you're wrongly equating lines of code with amount of functionality produced.

I agree however that adding more developers can slow things down but this is partly a result of how software is designed and work divided up.

iopq4 replies#
I don't actually work the extra hours, I just browse Reddit for a few hours a day. I really can't put in 8 hours of actual work, my brain melts after 6.
kochthesecond#
Thanks, I am not alone...

Continue this thread — 3 more replies

Continue this thread — 3 more replies