Lurker News
I think I've broken my own record with this one ~2500 lines of incoherent JavaScript/C#. Works though.

Comments (578) 119 threads

oraguy36 replies#
Oracle Database 12.2.

It is close to 25 million lines of C code.
What an unimaginable horror! You can't change a single line of code in the product without breaking 1000s of existing tests. Generations of programmers have worked on that code under difficult deadlines and filled the code with all kinds of crap.
Very complex pieces of logic, memory management, context switching, etc. are all held together with thousands of flags. The whole code is ridden with mysterious macros that one cannot decipher without picking a notebook and expanding relevant pats of the macros by hand. It can take a day to two days to really understand what a macro does.
Sometimes one needs to understand the values and the effects of 20 different flag to predict how the code would behave in different situations. Sometimes 100s too! I am not exaggerating.
The only reason why this product is still surviving and still works is due to literally millions of tests!
Here is how the life of an Oracle Database developer is:
- Start working on a new bug.
- Spend two weeks trying to understand the 20 different flags that interact in mysterious ways to cause this bag.
- Add one more flag to handle the new special scenario. Add a few more lines of code that checks this flag and works around the problematic situation and avoids the bug.
- Submit the changes to a test farm consisting of about 100 to 200 servers that would compile the code, build a new Oracle DB, and run the millions of tests in a distributed fashion.
- Go home. Come the next day and work on something else. The tests can take 20 hours to 30 hours to complete.
- Go home. Come the next day and check your farm test results. On a good day, there would be about 100 failing tests. On a bad day, there would be about 1000 failing tests. Pick some of these tests randomly and try to understand what went wrong with your assumptions. Maybe there are some 10 more flags to consider to truly understand the nature of the bug.
- Add a few more flags in an attempt to fix the issue. Submit the changes again for testing. Wait another 20 to 30 hours.
- Rinse and repeat for another two weeks until you get the mysterious incantation of the combination of flags right.
- Finally one fine day you would succeed with 0 tests failing.
- Add a hundred more tests for your new change to ensure that the next developer who has the misfortune of touching this new piece of code never ends up breaking your fix.
- Submit the work for one final round of testing. Then submit it for review. The review itself may take another 2 weeks to 2 months. So now move on to the next bug to work on.
- After 2 weeks to 2 months, when everything is complete, the code would be finally merged into the main branch.
The above is a non-exaggerated description of the life of a programmer in Oracle fixing a bug. Now imagine what horror it is going to be to develop a new feature. It takes 6 months to a year (sometimes two years!) to develop a single small feature (say something like adding a new mode of authentication like support for AD authentication).
The fact that this product even works is nothing short of a miracle!
I don't work for Oracle anymore. Will never work for Oracle again!

eismcc1 reply#
At least there are tests!
gnulinux8 replies#
Tests that run for 30 hours is an indication that nobody bothered writing unittests. If you need to run all tests after changing X, it means X is NOT tested. Instead you need to rely on integrations tests catching Xs behavior.
semicolon_storm#
It could also be that the flags are so tangled together that a change to one part of the system can break many other parts that are completely unrelated. Sure you can run a unit test for X, but what about Y? Retesting everything is all you can do when everything is so tangled you can’t predict what a change could effect.
hprobotic#
How about XS Max =]]
adrianN#
Integration tests are pretty important in huge codebases with complex interactions. Unit tests are of course useful to shorten the dev cycle, but you need to design your software to be amenable to unit testing. Bolting them onto a legacy codebase can be really hard.
danmaz744 replies#
I beg to differ. Having to run the full test suite to catch significant errors is an indication that the software design isn't (very) modular, but it has nothing to do with unit tests. Unit tests do not replace service/integration/end to end tests, they only complement them - see the "test pyramid".

I think it's important to point this out, because one of the biggest mistakes I'm seeing developers do these days is relying too much on unit tests (especially on "behavior" tests using mocks) and not trying to catch problems at a higher level using higher level tests. Then the code gets deployed and - surprise surprise - all kinds of unforeseen errors come out.
Unit tests are useful, but they are, by definition, very limited in scope.

Continue this thread — 4 replies

theshrike791 reply#
In large systems you can unit test your code within an inch of its life and it can still fail in integration tests.

Continue this thread — 1 reply

oraguy3 replies#
> Tests that run for 30 hours is an indication that nobody bothered writing unittests.

Yes, they were not unit tests. There was no culture of unit tests in the Oracle Database development team. A few people called it "unit tests" but they either said it loosely or they were mistaken.
Unit test would not have been effective because every area of the code was deeply entangled with everything else. They did have the concept of layered code (like a virtual operting system layer at the bottom, a memory management layer on top of that, a querying engine on top of that, and so on) but over the years, people violated layers and wrote code that called an upper layer from lower layer leading to a big spaghetti mess. A change in one module could cause a very unrelated module to fail in mysterious ways.
Every test was almost always an integration test. Every test case restarted the database, connected to the database, created tables in it, inserted test data into it, ran queries, and compared the results to ensure that the observed results match the expected results. They tried to exercise every function and every branch condition in this manner with different test cases. The code coverage was remarkable though. Some areas of the code had more than 95% test coverage while some other areas had 80% or so coverage. But the work was not fun.

Continue this thread — 3 replies

TickleSteve6 replies#
Always test "outside-in", i.e. integration tests first, then if you can afford it, unit tests.

Integration tests test those things you're going to get paid for... features & use-cases.
Having a huge library of unit tests freezes your design and hampers your ability to modify in the future.

Continue this thread — 6 replies

Tharkun#
If you're only writing tests at the unit level, you might as well not bother. And it's always good to run all tests after any change, it's entirely too easy for the developer to have an incomplete understanding of the implications of a change. Or for another developer to misuse other functionality, deliberately or otherwise.
sebslomski1 reply#
Fingers crossed that there are no merge conflicts & conflicting tests.
kamaal#
Everyone's on the same 2 month like schedules, so I guess that won't be much of a problem.
satanic_pope1 reply#
Good lord, just reading it can cause panic attack.
christophilus1 reply#
It literally gave me a sinking feeling. I’d quit that job on day 0.
springfeld#
But you would have to wait for day 1+ to realize
swarnie_#
As someone who codes an ERP app built on 12.2 this comment resonated with me in ways you can't begin to imagine.
Izkata7 replies#
A sentiment among members of a former team was that automated tests meant you didn't need to write understandable code - let the tests do the thinking for you.

This, and stuff like your story, are why I don't trust people who promote test-driven development as the best way to write clean APIs.

pmarreck3 replies#
TDD doesn't think for you, it merely validates your own existing understanding/mental model and forces you to come up with it upfront. This is hardly a thing to be mistrustful about, unless you work with idiots.
bryanrasmussen3 replies#
ok but from reading a lot of the comments on HN it sounds like many posters here think that they do work with idiots.

Continue this thread — 3 replies

danmaz74#
> TDD doesn't think for you

I totally agree, but I met several programmers who think the opposite.

mannykannot1 reply#
You are right about that, but having code that passes a given test suite doesn't say anything about its secondary qualities, such as whether it can be understood. In theory, a failing test could improve your understanding of the situation, allowing you to refactor your initial pass at a solution, but I would bet that on this particular code base, the comprehension-raising doesn't go far enough, in most cases, for this to be feasible.

Continue this thread — 1 reply

sooheon2 replies#
Rich Hickey called it guard rail driven programming. You'll never drive where you want to go if you just get on the highway and bump off the guard rails.
carlmr6 replies#
Except that's a really bad analogy. It's more like you set up guard rails, and every time your vehicle hits a guard rail you change the algorithm it uses for navigation until it can do a whole run without hitting a guard rail.

I've experienced myself how the code quality of proper TDD code can be amazing. However it needs someone to still actually care about what they're doing. So it doesn't help with idiots.

Continue this thread — 6 replies

specialist#
Nice imagery. I like it.

The other commenters made me think of the kids game Operation. https://en.wikipedia.org/wiki/Operation_(game)
How about shock collar programming? Or electric fence programming? Or block stacking (Jenga) programming.
Good times.

Continue this thread — 5 more replies

Continue this thread — 31 more replies

dejv13 replies#
I am maintaining one application in construction industry space. That application was created 25 years ago by construction worker that never wrote single line of code before, but because he caused a lot of problems on construction site they give him Programming 101 book and let him build it.

15 years later the app was close to half milion lines long of huge bowl of spaghetti code. Only comments in whole codebase were timestamps. I don't know why he dated his code, but I find it fascinating: he never deleted basically anything so you can find different timeframes of when he discovered various concepts. There is use-exception-instead-of-if period, there is time when he discovered design patterns, there is time before he learnt SQL so all the database queries was done by iterating over whole tables and such. I am sure I will find commented Hello world somewhere in the code someday.
I am working on this codebase for 10 years. Code quality improved and major issues get fixed, but there is not enough budget to actually rewrote whole system, so after all it is more or less huge spaghetti monster and I get used to it.

umichguy#
That's fascinating and gave me a genuine laugh.
deepsun1 reply#
Well, if you're working on a codebase for 10 years, then "no budget" is not really an excuse, sorry. As a responsible engineer, you should have either convinced management to spend some of your time on refactoring main parts, or cleaned it up yourself bit-by-bit every time you touch something. 10 man-years should be enough for a program that was created in 10 years by a single rookie dev.
dejv1 reply#
Sure if this was my job, then I would do it but I am just contractor with set amount of hours devoted to the project. First few years was spend fighting fires as the company needed this very specific software to function, currently it is just about keeping eyes on having it run and occasional fix some report or update data pipelines.

I would say that rewrite would cost about 2 millions of euros. Which is really big price tag for company that use this system as a backoffice tool.

TheHaakon#
Some company have back offices that they've spent considerably more on. Airline companies for instance may have a tool that lets the person at the gate check who that person is, what their deal is, etc. And then GDPR happened and the bill to ensure that every rule is followed to the letter and suddenly 2M€ isn't that bad after all...
theflork1 reply#
What is he up to now?
dejv#
I don't know. The company is based in rural Austria and so it took company quite some time to find another engineer that will took on this project (me). I have never met him or have any other contact with him.
imAsking98361 reply#
Like reading the journal you found in the abandoned house you just moved in and it belonged to the previous kid that used to live there. Sounds like a movie.
dejv#
Oh yeah it might be commedy where two people argue about spaces vs tabs and there come our function of 20k lines in single block of code that never heard about using any of those... nor about moving repeated code to own function.
bryanrasmussen3 replies#
what kind of problems do you cause at a construction site that do not get you fired but reassigned to Programmer with programming 101 book?
adrianN1 reply#
Perhaps he played too much Minecraft and tried building a Turing machine from the materials on the construction site?
alorimer#
C can't be that different from redstone right?
smilesnd#
From my experience this means they had a strong union.

Continue this thread — 1 more reply

Continue this thread — 8 more replies

wcarss35 replies#
Years ago as an intern at Microsoft, I had code go into the Excel, PowerPoint, Word, Outlook, and shared Office code.

Excel is an incomprehensible maze of #defines and macros, PowerPoint is a Golden Temple of overly-object-oriented insanity, and Word is just so old and brittle you'd expect it to turn to dust by committing. There are "don't touch this!"-like messages left near the main loop _since roughly 1990_.
I had a bug in some IME code causing a popup to draw behind a window occasionally, and a Windows guru had to come in to figure it out by remote-debugging the windows draw code with no symbols.
I learned there that people can make enormous and powerful castles from, well, shit.

Continue this thread — 35 replies

boyter3 replies#
The worst program I ever worked on was something I was asked to maintain once. It consisted of two parts. The first was a web application writen in ASP. The second portion was essentially Microsoft Reporting Services implemented in 80,000 lines of VB.NET.

The first thing I did was chuck it into VS2010 and run some code metrics on it. The results were, 10 or so Methods had 2000+ lines of code. The maintainability index was 0 (number between 0 and 100 where 0 is unmaintainable). The worst function had a cyclomatic complexity of 2700 (the worst I have ever seen on a function before was 750 odd). It was full of nested in-line dynamic SQL all of which referred to tables with 100+ columns, which had helpful names like sdf_324. There were about 5000 stored procedures of which most were 90% similar to other ones with a similar naming scheme. There were no foreign key constraints in the database. Every query including updates, inserts and deletes used NOLOCK (so no data integrity). It all lived in a single 80,000 line file, which crashed VS every time you tried to do a simple edit.
I essentially told my boss I would quit over it as there was no way I could support it without other aspects of work suffering. Thankfully it was put in the too hard basket and nobody else had to endure my pain. I ended up peer reviewing the changes the guy made some time later and a single column update touched in the order of 500 lines of code.
There was one interesting thing I found with it however, there was so much repeated/nested if code in methods you could hold down page down and it would look like the page was moving the other way, similar to how a wheel on TV looks like its spinning the other way.

Continue this thread — 3 replies

Load more comments