It is close to 25 million lines of C code. What an unimaginable horror! You can't change a single line of code in the product without breaking 1000s of existing tests. Generations of programmers have worked on that code under difficult deadlines and filled the code with all kinds of crap. Very complex pieces of logic, memory management, context switching, etc. are all held together with thousands of flags. The whole code is ridden with mysterious macros that one cannot decipher without picking a notebook and expanding relevant pats of the macros by hand. It can take a day to two days to really understand what a macro does. Sometimes one needs to understand the values and the effects of 20 different flag to predict how the code would behave in different situations. Sometimes 100s too! I am not exaggerating. The only reason why this product is still surviving and still works is due to literally millions of tests! Here is how the life of an Oracle Database developer is: - Start working on a new bug. - Spend two weeks trying to understand the 20 different flags that interact in mysterious ways to cause this bag. - Add one more flag to handle the new special scenario. Add a few more lines of code that checks this flag and works around the problematic situation and avoids the bug. - Submit the changes to a test farm consisting of about 100 to 200 servers that would compile the code, build a new Oracle DB, and run the millions of tests in a distributed fashion. - Go home. Come the next day and work on something else. The tests can take 20 hours to 30 hours to complete. - Go home. Come the next day and check your farm test results. On a good day, there would be about 100 failing tests. On a bad day, there would be about 1000 failing tests. Pick some of these tests randomly and try to understand what went wrong with your assumptions. Maybe there are some 10 more flags to consider to truly understand the nature of the bug. - Add a few more flags in an attempt to fix the issue. Submit the changes again for testing. Wait another 20 to 30 hours. - Rinse and repeat for another two weeks until you get the mysterious incantation of the combination of flags right. - Finally one fine day you would succeed with 0 tests failing. - Add a hundred more tests for your new change to ensure that the next developer who has the misfortune of touching this new piece of code never ends up breaking your fix. - Submit the work for one final round of testing. Then submit it for review. The review itself may take another 2 weeks to 2 months. So now move on to the next bug to work on. - After 2 weeks to 2 months, when everything is complete, the code would be finally merged into the main branch. The above is a non-exaggerated description of the life of a programmer in Oracle fixing a bug. Now imagine what horror it is going to be to develop a new feature. It takes 6 months to a year (sometimes two years!) to develop a single small feature (say something like adding a new mode of authentication like support for AD authentication). The fact that this product even works is nothing short of a miracle! I don't work for Oracle anymore. Will never work for Oracle again!
Tests that run for 30 hours is an indication that nobody bothered writing unittests. If you need to run all tests after changing X, it means X is NOT tested. Instead you need to rely on integrations tests catching Xs behavior.
It could also be that the flags are so tangled together that a change to one part of the system can break many other parts that are completely unrelated. Sure you can run a unit test for X, but what about Y? Retesting everything is all you can do when everything is so tangled you can’t predict what a change could effect.
Integration tests are pretty important in huge codebases with complex interactions. Unit tests are of course useful to shorten the dev cycle, but you need to design your software to be amenable to unit testing. Bolting them onto a legacy codebase can be really hard.
I beg to differ. Having to run the full test suite to catch significant errors is an indication that the software design isn't (very) modular, but it has nothing to do with unit tests. Unit tests do not replace service/integration/end to end tests, they only complement them - see the "test pyramid".
I think it's important to point this out, because one of the biggest mistakes I'm seeing developers do these days is relying too much on unit tests (especially on "behavior" tests using mocks) and not trying to catch problems at a higher level using higher level tests. Then the code gets deployed and - surprise surprise - all kinds of unforeseen errors come out. Unit tests are useful, but they are, by definition, very limited in scope.
Exactly. I have a product that spans multiple devices and multiple architectures: micro controllers, SDKs and drivers running on PCs, third-party devices with firmware on them and FPGA code. They all evolve at their own pace, and there’s a big explosion of possible combinations in the field.
We ended up emulating the hardware, run all the software on the emulated hardware, and deploy integration tests to a thousand nodes on AWS for a few minutes it takes to test each combination. Tests finish quickly and it has been a while since we shipped something with a bug in it. But there’s a catch: we have to unit test the test infrastructure against real hardware - I believe it’d be called test validation. Thus all the individual emulators and cosimulation setups have to have equivalent physical test benches, automated so that no human interaction is needed to compare emulated output to real output. In more than a few cases, we need cycle-accurate behavior. The test harness unit (validation ) test has to, for example, spin up a logic analyzer and a few MSO oscilloscopes, reinitialize the test bench – e.g. load the 3rd party firmware we test against, then get it all synchronized and run the validation scenarios.
Oh, and the firmware of the instrumentation is also a part of the setup: we found bugs in T&M equipment firmware/software that would break our tests. We regression test that stuff, too. All in all, a full test suite, run sequentially, takes about 40,000 hours, and that’s when being very careful about orthogonalizing the tests so that there’s a good balance between integration aspects and unit aspects. I totally dig why Oracle has to do something like this, but on the other hand, we have a code base that’s not very brittle, but the integration aspects make it mostly impossible to reason about what could possibly break - so we either test, or get the support people overwhelmed with angry calls. Had we had brittle code on top of it, we’d have been doomed.
> Tests that run for 30 hours is an indication that nobody bothered writing unittests.
Yes, they were not unit tests. There was no culture of unit tests in the Oracle Database development team. A few people called it "unit tests" but they either said it loosely or they were mistaken. Unit test would not have been effective because every area of the code was deeply entangled with everything else. They did have the concept of layered code (like a virtual operting system layer at the bottom, a memory management layer on top of that, a querying engine on top of that, and so on) but over the years, people violated layers and wrote code that called an upper layer from lower layer leading to a big spaghetti mess. A change in one module could cause a very unrelated module to fail in mysterious ways. Every test was almost always an integration test. Every test case restarted the database, connected to the database, created tables in it, inserted test data into it, ran queries, and compared the results to ensure that the observed results match the expected results. They tried to exercise every function and every branch condition in this manner with different test cases. The code coverage was remarkable though. Some areas of the code had more than 95% test coverage while some other areas had 80% or so coverage. But the work was not fun.
Always test "outside-in", i.e. integration tests first, then if you can afford it, unit tests.
Integration tests test those things you're going to get paid for... features & use-cases. Having a huge library of unit tests freezes your design and hampers your ability to modify in the future.
If you're only writing tests at the unit level, you might as well not bother. And it's always good to run all tests after any change, it's entirely too easy for the developer to have an incomplete understanding of the implications of a change. Or for another developer to misuse other functionality, deliberately or otherwise.
A sentiment among members of a former team was that automated tests meant you didn't need to write understandable code - let the tests do the thinking for you.
This, and stuff like your story, are why I don't trust people who promote test-driven development as the best way to write clean APIs.
TDD doesn't think for you, it merely validates your own existing understanding/mental model and forces you to come up with it upfront. This is hardly a thing to be mistrustful about, unless you work with idiots.
You are right about that, but having code that passes a given test suite doesn't say anything about its secondary qualities, such as whether it can be understood. In theory, a failing test could improve your understanding of the situation, allowing you to refactor your initial pass at a solution, but I would bet that on this particular code base, the comprehension-raising doesn't go far enough, in most cases, for this to be feasible.
Rich Hickey called it guard rail driven programming. You'll never drive where you want to go if you just get on the highway and bump off the guard rails.
Except that's a really bad analogy. It's more like you set up guard rails, and every time your vehicle hits a guard rail you change the algorithm it uses for navigation until it can do a whole run without hitting a guard rail.
I've experienced myself how the code quality of proper TDD code can be amazing. However it needs someone to still actually care about what they're doing. So it doesn't help with idiots.
The other commenters made me think of the kids game Operation. https://en.wikipedia.org/wiki/Operation_(game) How about shock collar programming? Or electric fence programming? Or block stacking (Jenga) programming. Good times.
Comments (578) 119 threads
Show all comments
Showing thread 1 of 119
It is close to 25 million lines of C code.
What an unimaginable horror! You can't change a single line of code in the product without breaking 1000s of existing tests. Generations of programmers have worked on that code under difficult deadlines and filled the code with all kinds of crap.
Very complex pieces of logic, memory management, context switching, etc. are all held together with thousands of flags. The whole code is ridden with mysterious macros that one cannot decipher without picking a notebook and expanding relevant pats of the macros by hand. It can take a day to two days to really understand what a macro does.
Sometimes one needs to understand the values and the effects of 20 different flag to predict how the code would behave in different situations. Sometimes 100s too! I am not exaggerating.
The only reason why this product is still surviving and still works is due to literally millions of tests!
Here is how the life of an Oracle Database developer is:
- Start working on a new bug.
- Spend two weeks trying to understand the 20 different flags that interact in mysterious ways to cause this bag.
- Add one more flag to handle the new special scenario. Add a few more lines of code that checks this flag and works around the problematic situation and avoids the bug.
- Submit the changes to a test farm consisting of about 100 to 200 servers that would compile the code, build a new Oracle DB, and run the millions of tests in a distributed fashion.
- Go home. Come the next day and work on something else. The tests can take 20 hours to 30 hours to complete.
- Go home. Come the next day and check your farm test results. On a good day, there would be about 100 failing tests. On a bad day, there would be about 1000 failing tests. Pick some of these tests randomly and try to understand what went wrong with your assumptions. Maybe there are some 10 more flags to consider to truly understand the nature of the bug.
- Add a few more flags in an attempt to fix the issue. Submit the changes again for testing. Wait another 20 to 30 hours.
- Rinse and repeat for another two weeks until you get the mysterious incantation of the combination of flags right.
- Finally one fine day you would succeed with 0 tests failing.
- Add a hundred more tests for your new change to ensure that the next developer who has the misfortune of touching this new piece of code never ends up breaking your fix.
- Submit the work for one final round of testing. Then submit it for review. The review itself may take another 2 weeks to 2 months. So now move on to the next bug to work on.
- After 2 weeks to 2 months, when everything is complete, the code would be finally merged into the main branch.
The above is a non-exaggerated description of the life of a programmer in Oracle fixing a bug. Now imagine what horror it is going to be to develop a new feature. It takes 6 months to a year (sometimes two years!) to develop a single small feature (say something like adding a new mode of authentication like support for AD authentication).
The fact that this product even works is nothing short of a miracle!
I don't work for Oracle anymore. Will never work for Oracle again!
I think it's important to point this out, because one of the biggest mistakes I'm seeing developers do these days is relying too much on unit tests (especially on "behavior" tests using mocks) and not trying to catch problems at a higher level using higher level tests. Then the code gets deployed and - surprise surprise - all kinds of unforeseen errors come out.
Unit tests are useful, but they are, by definition, very limited in scope.
Continue this thread — 4 replies
We ended up emulating the hardware, run all the software on the emulated hardware, and deploy integration tests to a thousand nodes on AWS for a few minutes it takes to test each combination. Tests finish quickly and it has been a while since we shipped something with a bug in it.
But there’s a catch: we have to unit test the test infrastructure against real hardware - I believe it’d be called test validation. Thus all the individual emulators and cosimulation setups have to have equivalent physical test benches, automated so that no human interaction is needed to compare emulated output to real output. In more than a few cases, we need cycle-accurate behavior.
The test harness unit (validation ) test has to, for example, spin up a logic analyzer and a few MSO oscilloscopes, reinitialize the test bench – e.g. load the 3rd party firmware we test against, then get it all synchronized and run the validation scenarios. Oh, and the firmware of the instrumentation is also a part of the setup: we found bugs in T&M equipment firmware/software that would break our tests. We regression test that stuff, too.
All in all, a full test suite, run sequentially, takes about 40,000 hours, and that’s when being very careful about orthogonalizing the tests so that there’s a good balance between integration aspects and unit aspects.
I totally dig why Oracle has to do something like this, but on the other hand, we have a code base that’s not very brittle, but the integration aspects make it mostly impossible to reason about what could possibly break - so we either test, or get the support people overwhelmed with angry calls. Had we had brittle code on top of it, we’d have been doomed.
Yes, they were not unit tests. There was no culture of unit tests in the Oracle Database development team. A few people called it "unit tests" but they either said it loosely or they were mistaken.
Unit test would not have been effective because every area of the code was deeply entangled with everything else. They did have the concept of layered code (like a virtual operting system layer at the bottom, a memory management layer on top of that, a querying engine on top of that, and so on) but over the years, people violated layers and wrote code that called an upper layer from lower layer leading to a big spaghetti mess. A change in one module could cause a very unrelated module to fail in mysterious ways.
Every test was almost always an integration test. Every test case restarted the database, connected to the database, created tables in it, inserted test data into it, ran queries, and compared the results to ensure that the observed results match the expected results. They tried to exercise every function and every branch condition in this manner with different test cases. The code coverage was remarkable though. Some areas of the code had more than 95% test coverage while some other areas had 80% or so coverage. But the work was not fun.
Continue this thread — 3 replies
Integration tests test those things you're going to get paid for... features & use-cases.
Having a huge library of unit tests freezes your design and hampers your ability to modify in the future.
Continue this thread — 6 replies
This, and stuff like your story, are why I don't trust people who promote test-driven development as the best way to write clean APIs.
Continue this thread — 3 replies
I totally agree, but I met several programmers who think the opposite.
Continue this thread — 1 reply
I've experienced myself how the code quality of proper TDD code can be amazing. However it needs someone to still actually care about what they're doing. So it doesn't help with idiots.
Continue this thread — 6 replies
The other commenters made me think of the kids game Operation. https://en.wikipedia.org/wiki/Operation_(game)
How about shock collar programming? Or electric fence programming? Or block stacking (Jenga) programming.
Good times.
Continue this thread — 5 more replies