Lurker News
I think I've broken my own record with this one ~2500 lines of incoherent JavaScript/C#. Works though.

Comments (578) 119 threads

Show all comments

Showing thread 1 of 119

oraguy36 replies#
Oracle Database 12.2.

It is close to 25 million lines of C code.
What an unimaginable horror! You can't change a single line of code in the product without breaking 1000s of existing tests. Generations of programmers have worked on that code under difficult deadlines and filled the code with all kinds of crap.
Very complex pieces of logic, memory management, context switching, etc. are all held together with thousands of flags. The whole code is ridden with mysterious macros that one cannot decipher without picking a notebook and expanding relevant pats of the macros by hand. It can take a day to two days to really understand what a macro does.
Sometimes one needs to understand the values and the effects of 20 different flag to predict how the code would behave in different situations. Sometimes 100s too! I am not exaggerating.
The only reason why this product is still surviving and still works is due to literally millions of tests!
Here is how the life of an Oracle Database developer is:
- Start working on a new bug.
- Spend two weeks trying to understand the 20 different flags that interact in mysterious ways to cause this bag.
- Add one more flag to handle the new special scenario. Add a few more lines of code that checks this flag and works around the problematic situation and avoids the bug.
- Submit the changes to a test farm consisting of about 100 to 200 servers that would compile the code, build a new Oracle DB, and run the millions of tests in a distributed fashion.
- Go home. Come the next day and work on something else. The tests can take 20 hours to 30 hours to complete.
- Go home. Come the next day and check your farm test results. On a good day, there would be about 100 failing tests. On a bad day, there would be about 1000 failing tests. Pick some of these tests randomly and try to understand what went wrong with your assumptions. Maybe there are some 10 more flags to consider to truly understand the nature of the bug.
- Add a few more flags in an attempt to fix the issue. Submit the changes again for testing. Wait another 20 to 30 hours.
- Rinse and repeat for another two weeks until you get the mysterious incantation of the combination of flags right.
- Finally one fine day you would succeed with 0 tests failing.
- Add a hundred more tests for your new change to ensure that the next developer who has the misfortune of touching this new piece of code never ends up breaking your fix.
- Submit the work for one final round of testing. Then submit it for review. The review itself may take another 2 weeks to 2 months. So now move on to the next bug to work on.
- After 2 weeks to 2 months, when everything is complete, the code would be finally merged into the main branch.
The above is a non-exaggerated description of the life of a programmer in Oracle fixing a bug. Now imagine what horror it is going to be to develop a new feature. It takes 6 months to a year (sometimes two years!) to develop a single small feature (say something like adding a new mode of authentication like support for AD authentication).
The fact that this product even works is nothing short of a miracle!
I don't work for Oracle anymore. Will never work for Oracle again!

eismcc1 reply#
At least there are tests!
gnulinux8 replies#
Tests that run for 30 hours is an indication that nobody bothered writing unittests. If you need to run all tests after changing X, it means X is NOT tested. Instead you need to rely on integrations tests catching Xs behavior.
semicolon_storm#
It could also be that the flags are so tangled together that a change to one part of the system can break many other parts that are completely unrelated. Sure you can run a unit test for X, but what about Y? Retesting everything is all you can do when everything is so tangled you can’t predict what a change could effect.
hprobotic#
How about XS Max =]]
adrianN#
Integration tests are pretty important in huge codebases with complex interactions. Unit tests are of course useful to shorten the dev cycle, but you need to design your software to be amenable to unit testing. Bolting them onto a legacy codebase can be really hard.
danmaz744 replies#
I beg to differ. Having to run the full test suite to catch significant errors is an indication that the software design isn't (very) modular, but it has nothing to do with unit tests. Unit tests do not replace service/integration/end to end tests, they only complement them - see the "test pyramid".

I think it's important to point this out, because one of the biggest mistakes I'm seeing developers do these days is relying too much on unit tests (especially on "behavior" tests using mocks) and not trying to catch problems at a higher level using higher level tests. Then the code gets deployed and - surprise surprise - all kinds of unforeseen errors come out.
Unit tests are useful, but they are, by definition, very limited in scope.

Continue this thread — 4 replies

theshrike791 reply#
In large systems you can unit test your code within an inch of its life and it can still fail in integration tests.

Continue this thread — 1 reply

oraguy3 replies#
> Tests that run for 30 hours is an indication that nobody bothered writing unittests.

Yes, they were not unit tests. There was no culture of unit tests in the Oracle Database development team. A few people called it "unit tests" but they either said it loosely or they were mistaken.
Unit test would not have been effective because every area of the code was deeply entangled with everything else. They did have the concept of layered code (like a virtual operting system layer at the bottom, a memory management layer on top of that, a querying engine on top of that, and so on) but over the years, people violated layers and wrote code that called an upper layer from lower layer leading to a big spaghetti mess. A change in one module could cause a very unrelated module to fail in mysterious ways.
Every test was almost always an integration test. Every test case restarted the database, connected to the database, created tables in it, inserted test data into it, ran queries, and compared the results to ensure that the observed results match the expected results. They tried to exercise every function and every branch condition in this manner with different test cases. The code coverage was remarkable though. Some areas of the code had more than 95% test coverage while some other areas had 80% or so coverage. But the work was not fun.

Continue this thread — 3 replies

TickleSteve3 replies#
Always test "outside-in", i.e. integration tests first, then if you can afford it, unit tests.

Integration tests test those things you're going to get paid for... features & use-cases.
Having a huge library of unit tests freezes your design and hampers your ability to modify in the future.

mooreds3 replies#
Love the idea of this.

In my experience it's far easier to introduce testing by focusing on unit testing complicated, stateless business logic. The setup is less complex, the feedback cycle is quick, and the value is apparent ("oh gosh, now I understand all these edge cases and can change this complicated code with more confidence"). I think it also leads to better code at the class/module/function level.
In my experience once a test (of any kind) saves a developer from a regression, they become far more amenable to writing more tests.
That said I think starting with integration tests might be a good area of growth for me.

Continue this thread — 3 replies

mercer#
While I see some value in the red-green unit testing approach, I've found the drawbacks to often eclipse the advantages, especially under real-world time constraints.

In my day to day programming, when I neglect writing tests, the regret is always about those that are on the side of integration testing. I'm okay with not testing individual functions or individual modules even. But the stuff that 'integrates' various modules/concerns is almost always worth writing tests for.

Tharkun#
If you're only writing tests at the unit level, you might as well not bother. And it's always good to run all tests after any change, it's entirely too easy for the developer to have an incomplete understanding of the implications of a change. Or for another developer to misuse other functionality, deliberately or otherwise.
sebslomski1 reply#
Fingers crossed that there are no merge conflicts & conflicting tests.
kamaal#
Everyone's on the same 2 month like schedules, so I guess that won't be much of a problem.
satanic_pope1 reply#
Good lord, just reading it can cause panic attack.
christophilus1 reply#
It literally gave me a sinking feeling. I’d quit that job on day 0.
springfeld#
But you would have to wait for day 1+ to realize
swarnie_#
As someone who codes an ERP app built on 12.2 this comment resonated with me in ways you can't begin to imagine.
Izkata7 replies#
A sentiment among members of a former team was that automated tests meant you didn't need to write understandable code - let the tests do the thinking for you.

This, and stuff like your story, are why I don't trust people who promote test-driven development as the best way to write clean APIs.

pmarreck3 replies#
TDD doesn't think for you, it merely validates your own existing understanding/mental model and forces you to come up with it upfront. This is hardly a thing to be mistrustful about, unless you work with idiots.
bryanrasmussen3 replies#
ok but from reading a lot of the comments on HN it sounds like many posters here think that they do work with idiots.

Continue this thread — 3 replies

danmaz74#
> TDD doesn't think for you

I totally agree, but I met several programmers who think the opposite.

mannykannot1 reply#
You are right about that, but having code that passes a given test suite doesn't say anything about its secondary qualities, such as whether it can be understood. In theory, a failing test could improve your understanding of the situation, allowing you to refactor your initial pass at a solution, but I would bet that on this particular code base, the comprehension-raising doesn't go far enough, in most cases, for this to be feasible.

Continue this thread — 1 reply

sooheon2 replies#
Rich Hickey called it guard rail driven programming. You'll never drive where you want to go if you just get on the highway and bump off the guard rails.
carlmr6 replies#
Except that's a really bad analogy. It's more like you set up guard rails, and every time your vehicle hits a guard rail you change the algorithm it uses for navigation until it can do a whole run without hitting a guard rail.

I've experienced myself how the code quality of proper TDD code can be amazing. However it needs someone to still actually care about what they're doing. So it doesn't help with idiots.

Continue this thread — 6 replies

specialist#
Nice imagery. I like it.

The other commenters made me think of the kids game Operation. https://en.wikipedia.org/wiki/Operation_(game)
How about shock collar programming? Or electric fence programming? Or block stacking (Jenga) programming.
Good times.

Continue this thread — 5 more replies

Continue this thread — 31 more replies